Tag: measuring carbon

Q1 energy analysis

Posted on April 30, 2026May 1, 2026 by Cam
We measure and share energy use with colleagues monthly. It’s not that exciting for non-tenants however so we’re restricting updates to once a quarter. A new addition is the Split Chart wh... Read More

2025 energy analysis

Posted on January 22, 2026April 8, 2026 by Cam
Attached is the annual report outlining Claydon Court energy use in 2025. Energy use increased by 17% during the year, this was due to increases in both user intensity and EV Charger use.   ... Read More

Q3 energy analysis

Posted on October 15, 2025April 8, 2026 by Rigsby
Total energy Overall energy use was the lowest it has been for two years at just under 6,944 kWh. Energy Split Split now includes contribution from PV panels. These are checked monthly following the l... Read More

August energy analysis

Posted on September 12, 2025September 12, 2025 by Rigsby
Read More

July energy analysis

Posted on August 22, 2025August 22, 2025 by Rigsby
Electricity use returned to more usual levels in July, partly due to getting PV panels reconnected.... Read More

June energy analysis

Posted on July 18, 2025July 18, 2025 by Rigsby
Hot weather combined with PV fault to push energy use above 2024 levels.... Read More

March energy analysis

Posted on April 9, 2025June 9, 2025 by Rigsby
Above: overall site electricity analysis. Below: New electricity split figures to reflect growing importance of EV use.... Read More

February energy analysis

Posted on March 16, 2025June 9, 2025 by Rigsby
Use at 10k kWh is higher than both 2024 and 2023.Emissions approx 2.0 tonnes or carbon, will be adjusted by WLT offsetting due shortly.Cost below 2024 figures but new contract in April sees current co... Read More

Energy analysis 2024

Posted on February 14, 2025February 14, 2025 by Rigsby
Linked is the brief Energy Report produced for Claydon Court. It confirms two things … First, that property reductions emissions have plateaued following investments that have seen EPC ratings m... Read More

January energy analysis

Posted on February 3, 2025February 14, 2025 by Rigsby
Use is hard to spot as a single data point but at 11.2 MWh is 13% higher than 2024.Emissions approx 2.2 tonnes or carbon, will be adjusted by WLT offsetting due shortly.Cost below 2024 figures but new... Read More

December energy analysis

Posted on January 3, 2025February 14, 2025 by Rigsby
Initial 2024 usage charts. We will dig deeper in Annual Analysis out shortly.... Read More

November energy analysis

Posted on December 4, 2024February 14, 2025 by Rigsby
Energy (i.e. electricity) use is shared with all tenants as part of our Less is MOR programme i.e. Measure Offset Reduce. We’re reduced our EPC Rating from G to A but still not reducing as quick... Read More

October energy analysis

Posted on November 2, 2024February 14, 2025 by Rigsby
Read More

September energy analysis

Posted on October 1, 2024 by Rigsby
Read More

August energy analysis

Posted on August 31, 2024 by Rigsby
Read More

July energy analysis

Posted on August 16, 2024August 16, 2024 by Rigsby
Use, emissions and cost all lower than the bizarre spike last year.... Read More

EV Charger conundrum

Posted on June 30, 2024November 19, 2024 by Rigsby
A new development at Claydon Court is the expansion of our EV Charger ‘farm’ from 3 to 6 with the capacity to double again from 6 to 12 when needed. New Sevadis chargers allow precise ener... Read More

May Energy Use

Posted on June 7, 2024 by Rigsby
May energy Use and Emissions similar to previous years. Cost reduced due to Ecotricity contract.... Read More

April Energy

Posted on May 3, 2024May 3, 2024 by Rigsby
Use and emissions both similar to previous years, more work is needed to reduce these quicker. Cost drops dramatically as new lower price contract with Ecotricity starts.... Read More

March Energy

Posted on April 10, 2024April 10, 2024 by Rigsby
Use, emissions and costs are all falling as the weather warms up and heating is used less. Cost will fall further as our lower contact rates start in April.... Read More
  • 1 of 5
  • 1
  • 2
  • 3
  • …
  • 5
  • Next »

Recent Posts

  • Claydon Court joins Natural Capital
  • Promoting Suffolk Sustainable Business
  • Tadpoles update (2)
  • Q1 energy analysis
  • Flexible space: new limited offers

Archives

Tags

25 by 25 advent actions ai balancing carbon building carbon champions carbon charter carbon net zero carbon services champion of month climate change community community groups dashboards ecology building society electric vehicles ev chargers events flexible working fun green buildings greenest county green light trust grounds health lockdown low carbon champions low carbon deviants measuring carbon no mow may offsetting carbon online community PAS2060 pv panels quality system recycling reducing carbon rewilding SABRE social standards sustainability tenants wildlife world land trust
© 2026 Claydon Court. All Rights Reserved. Coller Theme by Rohit.
  • Contact Us
  • Legals
  • Documents